Relocation of General Hospital Central Production Kitchen: Approval of drawings and acceptance of tender

A formal published “Ministerial Decision” is required as a record of the decision of a Minister (or an Assistant Minister where they have delegated authority) as they exercise their responsibilities and powers.

Ministers are elected by the States Assembly and have legal responsibilities and powers as “corporation sole” under the States of Jersey Law 2005 by virtue of their office and in their areas of responsibility, including entering into agreements, and under any legislation conferring on them powers.

An accurate record of “Ministerial Decisions” is vital to effective governance, including:

  • demonstrating that good governance, and clear lines of accountability and authority, are in place around decisions-making – including the reasons and basis on which a decision is made, and the action required to implement a decision

  • providing a record of decisions and actions that will be available for examination by States Members, and Panels and Committees of the States Assembly; the public, organisations, and the media; and as a historical record and point of reference for the conduct of public affairs

Ministers are individually accountable to the States Assembly, including for the actions of the departments and agencies which discharge their responsibilities.

The Freedom of Information Law (Jersey) Law 2011 is used as a guide when determining what information is be published. While there is a presumption toward publication to support of transparency and accountability, detailed information may not be published if, for example, it would constitute a breach of data protection, or disclosure would prejudice commercial interest.

A decision made on 19 April 2018:

Decision Reference: MD-PH-2018-0022

 

Decision Summary Title :

Approval of drawings and acceptance of tender

Date of Decision Summary:

19 April 2018

Decision Summary Author:

Contracting Authority Lead – Relocation Works. FH Project

Decision Summary:

Public or Exempt?

Public  

Type of Report:

Oral or Written?

Written

Person Giving

Oral Report:

N/A

Written Report

Title :

Relocation of General Hospital central production kitchen to 9/10 St Peter’s Technical Park – Approval of Drawings and Funding

Date of Written Report:

19 April 2018

Written Report Author:

Contracting Authority Lead – Relocation Works. FH Project

Written Report :

Public or Exempt?

 

Exempt

QE Article 33(b) and QE Article 34(b)

Subject:

Relocation of General Hospital central production kitchen to 9/10 St Peter’s Technical Park. Acceptance of tender to construct facility within existing industrial building.

Decision(s):

a)     In accordance with paragraph 1 (d) of Standing Order 168, the Minister, approved drawings numbered/ref:

 

Planning Application - 1497_001A-Location Plan, 1497_100B-Site Plan, 1497_101A_Survey_Plans, 1497_102A_Existing NW & NE Elevations, 1497_104B_Photos, 1497_106D-Proposed Ground + 1st Floor Plans, 1497_107B-Proposed NW + NE Elevations, 1497_108B-Proposed SW + NE Elevations, 1497_109B-Sections A-A & B-B, FHP-HTG-ES01-01-DR-C-100-S2.P02 Proposed Drainage Layout, 8190.1 V1 BS4142 Assessment of Noise Impact from Mechanical Technical Plant, Transport technical Note

 

Building Permission -1497_001A-Location Plan, 1497_100B-Site Plan, 1497_101B_Survey_Plans & Section, 1497_102B_Survey Elevations NW & NE, 1497_104B_Photos, 1497_BL_106G-Proposed Ground Floor, 1497_BL_107D-Proposed First Floor, 1497_BL_108C-Proposed NW + NE Elevations, 1497_BL_109D-Sections A-A & B-B, 1497_BL_110C-Sections C-C & D-D, 1497_BL_112A-Bin Store, 1497_BL_115D-Proposed Ground Floor Compartments, 1497_BL_116D-Proposed First Floor Compartments, FHP-HTG-ES01-01-DR-C-100-S2.P03 Proposed Drainage Scheme, FHP-HTG-ES01-XX-RP-C-S2.P02 Drainage Proposal_Bye Laws, 180108 - Astute - DDN - ES01 Jersey - TOD- Rev00

 

 - all showing the proposed works to construct the central production kitchen at 9/10 St Peter’s Technical Park

 

b)     The Minister agreed to accept the lowest fixed price submitted by Camerons Ltd in the sum of £3,179,998.58 to construct the central production kitchen at 9/10 St Peter’s Technical Park and enter into a formal JCT Building Contract

Reason(s) for Decision:

The drawings noted in item a) above and which planning and building control has been granted (Planning Permit P/2017/1522 and Building Permit B/2017/1106 refers) reflect the use for which the funding is provided.

Under Standing Order 168 (1) (d), it is a requirement for the Minister for Infrastructure to approve plans for the construction (or alteration) of buildings where the work is to be funded wholly or partly by money voted by the States of Jersey.

The estimated total cost for the formation of the central production kitchen at 9/10 St Peter’s Technical Park (including the lowest tender received, professional fees and ‘other’ costs), as designed, can be completed within the allocated funding.

The lowest fixed price tender submitted by Camerons Ltd in the sum of £3,179,998.58 can be accepted and a contract entered into.

Resource Implications:

  1.       The financial implications of this decision are detailed in the accompanying report.
  2.       There are no manpower implications in respect of this decision.

Action required:

The Minister to sign the contract and any other associated documentation in accordance with the approved scheme of delegation

Signature:

 

Position:

Deputy E J Noel

Minister for Infrastructure

         

Date Signed:

 

 

Date of Decision (If different from Date Signed):

 