Decision(s): a) In accordance with paragraph 1 (d) of Standing Order 168, the Minister, approved drawings numbered/ref: Planning Application - 1497_001A-Location Plan, 1497_100B-Site Plan, 1497_101A_Survey_Plans, 1497_102A_Existing NW & NE Elevations, 1497_104B_Photos, 1497_106D-Proposed Ground + 1st Floor Plans, 1497_107B-Proposed NW + NE Elevations, 1497_108B-Proposed SW + NE Elevations, 1497_109B-Sections A-A & B-B, FHP-HTG-ES01-01-DR-C-100-S2.P02 Proposed Drainage Layout, 8190.1 V1 BS4142 Assessment of Noise Impact from Mechanical Technical Plant, Transport technical Note Building Permission -1497_001A-Location Plan, 1497_100B-Site Plan, 1497_101B_Survey_Plans & Section, 1497_102B_Survey Elevations NW & NE, 1497_104B_Photos, 1497_BL_106G-Proposed Ground Floor, 1497_BL_107D-Proposed First Floor, 1497_BL_108C-Proposed NW + NE Elevations, 1497_BL_109D-Sections A-A & B-B, 1497_BL_110C-Sections C-C & D-D, 1497_BL_112A-Bin Store, 1497_BL_115D-Proposed Ground Floor Compartments, 1497_BL_116D-Proposed First Floor Compartments, FHP-HTG-ES01-01-DR-C-100-S2.P03 Proposed Drainage Scheme, FHP-HTG-ES01-XX-RP-C-S2.P02 Drainage Proposal_Bye Laws, 180108 - Astute - DDN - ES01 Jersey - TOD- Rev00 - all showing the proposed works to construct the central production kitchen at 9/10 St Peter’s Technical Park b) The Minister agreed to accept the lowest fixed price submitted by Camerons Ltd in the sum of £3,179,998.58 to construct the central production kitchen at 9/10 St Peter’s Technical Park and enter into a formal JCT Building Contract |
Reason(s) for Decision: The drawings noted in item a) above and which planning and building control has been granted (Planning Permit P/2017/1522 and Building Permit B/2017/1106 refers) reflect the use for which the funding is provided. Under Standing Order 168 (1) (d), it is a requirement for the Minister for Infrastructure to approve plans for the construction (or alteration) of buildings where the work is to be funded wholly or partly by money voted by the States of Jersey. The estimated total cost for the formation of the central production kitchen at 9/10 St Peter’s Technical Park (including the lowest tender received, professional fees and ‘other’ costs), as designed, can be completed within the allocated funding. The lowest fixed price tender submitted by Camerons Ltd in the sum of £3,179,998.58 can be accepted and a contract entered into. |