Planning and Environment (2011 Fees) (Jersey) Order 201-
Explanatory Note
This Order increases fees under the following enactments –
Animal Welfare (Licence Fee) (Jersey) Order 2008
Dangerous Wild Animals (Jersey) Law 1999
Artificial Insemination of Domestic Animals (Jersey) Law 1952
High Hedges (Application Fee) (Jersey) Order 2008
Waste Management (Fees) (Jersey) Order 2008
Planning and Building (Fees) (Jersey) Order 2008.
The increases are the first since 1st January 2010. The increases generally are around 2.5%.
However, the basis of calculation of the Schedule 1 fees for planning permission, and the Schedule 2 fees for building permission, for the creation of new flats and new dwelling houses has been recast and so those fees are not strictly comparable with the current fees.
Furthermore, certain planning and building fees will not change, notably in the area of certain modifications of existing structures.
The Order was made on and comes into force .
◊ | Draft 1 – 4th April 2011 | Page - 1 |
File No. |
Planning and Environment (2011 Fees) (Jersey) Order 201- | Article 6 |
Planning and Environment (2011 Fees) (Jersey) Order 201-
Made [date to be inserted]
Coming into force [date to be inserted]
THE MINISTER FOR PLANNING AND ENVIRONMENT, in pursuance of Articles 17(1)(c) and 39 of the Animal Welfare (Jersey) Law 2004, Article 21(2)(b) of the Dangerous Wild Animals (Jersey) Law 1999, Article 2(3) of the Artificial Insemination of Domestic Animals (Jersey) Law 1952, Article 6(1)(b) of the High Hedges (Jersey) Law 2008, Articles 18, 22, 106 and 108 of the Waste Management (Jersey) Law 2005 and Articles 9(3)(a), 28(3), 34(2)(c), 120 and 124(1) of the Planning and Building (Jersey) Law 2002, orders as follows –
1 Animal Welfare (Licence Fee) (Jersey) Order 2008 amended
In the Animal Welfare (Licence Fee) (Jersey) Order 2008 in the Article referred to in column 1 of the following table, for the amount specified opposite in column 2 there shall be substituted the amount specified opposite in column 3 –
“1 Article of Order | 2 Existing amount | 3 Substituted amount |
2(a)(i) | £118.20 | £121.15 |
2(a)(ii) | £177.56 | £182.00 |
2(b)(i) | £109.79 | £112.50 |
2(b)(ii) | £139.21 | £142.70 |
3(a)(i) | £118.20 | £121.15 |
3(a)(ii) | £177.56 | £182.00 |
3(b)(i) | £109.79 | £112.50 |
3(b)(ii) | £139.21 | £142.70 |
4(a) | £88.78 | £91.00 |
4(b) | £80.37 | £82.40 |
5(a) | £88.78 | £91.00 |
5(b) | £80.37 | £82.40”. |
2 Dangerous Wild Animals (Jersey) Law 1999 amended
In Schedule 3 to the Dangerous Wild Animals (Jersey) Law 1999 for the amount “£256.25” there shall be substituted the amount “£262.65”.
3 Artificial Insemination of Domestic Animals (Bovine Semen) (Jersey) Order 2008 amended
For Article 48 of the Artificial Insemination of Domestic Animals (Bovine Semen) (Jersey) Order 2008 there shall be substituted the following Article –
The following fees are prescribed for the purposes of Article 2(3) of the Artificial Insemination of Domestic Animals (Jersey) Law 1952 –
(a) for the grant of a licence of premises as an EC quarantine centre under Article 3(1), £165.75, plus a fee of £81.80 payable on the re-inspection of the premises after a year, and every year thereafter;
(b) for the grant of a licence of premises as an EC collection centre under Article 3(2), £206.65, plus a fee of £81.80 payable on the re-inspection of the premises after a year, and every year thereafter;
(c) for the grant of a licence of premises as an EC quarantine centre and as an EC collection centre under Article 3(1) and (2), £288.45, plus a fee of £81.80 payable on the re-inspection of the premises after a year, and every year thereafter;
(d) for the grant of a licence of premises as an EC storage centre under Article 3(3), £124.85, plus a fee of £81.80 payable on the re-inspection of the premises after a year, and every year thereafter;
(e) for approval of an animal under Article 5(1), £124.85;
(f) for approval of a veterinary surgeon under Article 6, £163.60;
(g) for the grant of a licence of premises as a domestic collection centre under Article 17(1), £206.65;
(h) for the grant of a licence of premises as a domestic storage centre under Article 17(2), £103.30;
(i) for the grant of a licence of premises as a domestic collection centre and as a domestic storage centre under Article 17(1) and (2), £247.55;
(j) for approval of a person under Article 19(1), £122.70;
(k) for the grant of a licence to a person as a collector under Article 30, £103.30;
(l) for approval of premises for storage under Article 35(c), £124.85;
(m) for approval of premises for storage under Article 36(c), £64.60.”.
4 High Hedges (Application Fee) (Jersey) Order 2008 amended
In Article 1(1) of the High Hedges (Application Fee) (Jersey) Order 2008, for the amount “£450” there shall be substituted the amount “£461.20”.
5 Waste Management (Fees) (Jersey) Order 2008 amended
For the table set out in Schedule 1 to the Waste Management (Fees) (Jersey) Order 2008 there shall be substituted the following table –
“Part 1 – Applications | Fee £ |
Licence application – | |
| high regulatory requirement | 2062.20 |
| medium regulatory requirement | 1674.55 |
| low regulatory requirement | 1254.55 |
Licence modification – | |
| significant modification | 840.00 |
| minor modification | 420.00 |
Licence transfer – | 420.00 |
Licence surrender – | |
| high regulatory requirement | 2062.20 |
| medium regulatory requirement | 1674.55 |
| low regulatory requirement | 1254.55 |
Waste carriers registration – | 109.85 |
Transboundary consignment note – | |
| application | 1135.00 |
| shipment fee – for each permitted shipment | 102.30 |
Internal consignment note – | 0.50 |
Part 2 – Annual fees | |
Licence subsistence – | |
| high inspection frequency | 11576.60 |
| medium inspection frequency | 5788.30 |
| low inspection frequency | 2896.85”. |
6 Planning and Building (Fees) (Jersey) Order 2008 amended
In the Planning and Building (Fees) (Jersey) Order 2008 –
(a) in Article 3, for the amount “£203” there shall be substituted the amount “£208”;
(b) for the table in Schedule 1 there shall be substituted the following table –
“ITEM | DESCRIPTION OF PROPOSED DEVELOPMENT | Fee (£) |
1 | NEW DWELLINGS – | |
| (i) construction of dwelling | |
| (ii) change of use of all or part of building to a dwelling | |
| (iii) extension of building which is not a dwelling to create a dwelling | |
| (iv) extension to an existing dwelling | |
| (v) extension of a dwelling into an existing building | |
| including, in each case, any necessary associated work | |
1.1 | For any application for a single new dwelling (or extension to a single dwelling), per square metre of floor area created – | 4.50 |
1.2 | For any application for more than one dwelling or for any application for a dwelling which is part of a wider development proposal, per square metre of floor area created – | 8.50 |
1.3 | PREFABRICATED PORTABLE DWELLING UNITS – per unit | 203 |
2 | MATERIAL ALTERATION OF EXISTING DWELLING – | |
| (i) where the estimated cost of the work, per dwelling, does not exceed £10,000 – | 102 |
| (ii) where the estimated cost of the work, per dwelling, exceeds £10,000 – | 203 |
3 | AGRICULTURAL OR HORTICULTURAL BUILDINGS – | |
| (i) construction of agricultural or horticultural building | |
| (ii) change of use of all or part of building to agricultural or horticultural building | |
| (iii) extension of building to extend or create agricultural or horticultural building | |
| including, in each case, any necessary associated work – | |
| | per 500 square metres or part thereof of the floor area of the building, part of the building or extension – | |
| | where the building is a glasshouse or polytunnel – | 208 |
| | Any other building – | 313 |
4 | BUILDINGS NOT CHARGEABLE UNDER ITEMS 1 TO 3 – | |
| (i) construction of building | |
| (ii) change of use of all or part of building | |
| (iii) extension of building | |
| including, in each case, any necessary associated work | |
| | per square metre – | 9.65 |
5 | MATERIAL ALTERATION OF BUILDING NOT CHARGEABLE UNDER ITEM 2 – | |
| | where the estimated cost of the work, per building, does not exceed £10,000 – | 104 |
| | where the estimated cost of the work, per building, exceeds £10,000 – | 208 |
6 | CHANGE OF USE NOT CHARGEABLE UNDER ITEMS 1, 3 or 4 – | 314 |
7 | EXTRACTION OF MINERALS FROM LAND – | |
| | per acre (2.25 vergées or 0.4 hectare) or part thereof of the site area – | 2619 |
8 | PLACING OF MOVEABLE STRUCTURE ON LAND – | 208 |
9 | CARRYING OUT OF MISCELLANEOUS SMALL WORK – | |
9.1 | To replace windows, other than with timber windows (per application) | 52 |
9.2 | To install a satellite dish | 52 |
9.3 | To erect a sign or advertisement (for each such to a maximum of £240) | 52 |
9.4 | To erect a flag pole, telephone box or similar structure (each) | 52 |
9.5 | To erect a wall, fence or similar structure (each) | 52 |
9.6 | To construct an unenclosed swimming pool | 208 |
9.7 | To form or alter a vehicular access | 208 |
9.8 | To provide or materially alter a tank used to store liquid or gaseous fuel | 52 |
10 | DEVELOPMENT OF LAND NOT CHARGEABLE UNDER ANY OTHER ITEM – | |
| (for example, to construct a reservoir or an outdoor recreational area) | |
| | per acre (2.25 vergées or 0.4 hectare) or part thereof of the site area – | 314”; |
| | | | | | | |
(c) for the table in Schedule 2 there shall be substituted the following table –
“ITEM | DESCRIPTION OF BUILDING WORK | Fee (£) |
1 | CREATION OF NEW DWELLING – | |
| (i) construction of dwelling | |
| (ii) change of use of all or part of a building to dwelling | |
| and, in either case, any associated works, including the provision of parking facilities | |
1.1 | FLATS | for each flat – | 765 |
1.2 | DWELLING HOUSES | for each dwelling house – | 1175 |
1.3 | PREFABRICATED PORTABLE DWELLING UNITS – per unit – | 200 |
2 | IMPROVEMENT OF DWELLING – | |
| and, in each case, any associated miscellaneous work | |
2.1 | Extension – | | |
| | not exceeding 20 square metres in floor area – | 370 |
| | exceeding 20 square metres in floor area but not exceeding 50 square metres in floor area – | 650 |
| | exceeding 50 square metres in floor area – | 725 |
2.2 | Loft conversion – | 430 |
2.3 | Erection or extension of a building that is ancillary to a dwelling, where the floor area of the building or extension – | |
| | does not exceed 20 square metres – | 120 |
| | exceeds 20 square metres but does not exceed 50 square metres – | 255 |
| | exceeds 50 square metres – | 300 |
2.4 | Material alteration of a dwelling – | |
| | where the estimated cost of the work does not exceed £5,000 – | 150 |
| | where the estimated cost of the work exceeds £5,000 but does not exceed £20,000 – | 250 |
| | where the estimated cost of the work exceeds £20,000 but does not exceed £50,000 – | 550 |
| | where the estimated cost of the work exceeds £50,000 – | 650 |
| NOTE 1 Where an application relates to the carrying out of more than one improvement listed in item 2 to a single dwelling, the fee payable under item 2 in respect of the dwelling is the highest of the fees that apply. NOTE 2 Where an application relates to the carrying out of improvements listed in item 2 to more than one dwelling, the fee payable shall be the aggregate of the fees payable in respect of each dwelling. | |
3 | BUILDING WORKS OR CHANGE OF USE NOT CHARGEABLE UNDER ITEM 1 OR 2 – | |
| including any associated work | |
3.1 | ERECTION OR EXTENSION FOR STORAGE – the erection or extension of a building where the main use is for storage purposes and where the floor area of the building or extension – | |
| | does not exceed 20 square metres – | 315 |
| | exceeds 20 square metres but does not exceed 50 square metres – | 440 |
| | exceeds 50 square metres but does not exceed 100 square metres – | 565 |
| | exceeds 100 square metres but does not exceed 250 square metres – | 1000 |
| | exceeds 250 square metres, for each 250 square metres or part thereof – | 1000 |
3.2 | ERECTION OR EXTENSION FOR OTHER USE – the erection or extension of a building where the main use is for purposes other than storage (including those parts of the building used for car parking and storage that are ancillary to the main use) – | |
| | per square metre of floor area of the building or extension – | 13 |
3.3 | Material alteration of a non-domestic building, or the provision or alteration of a controlled service in a non-domestic building, where the estimated cost of the work – | |
| | does not exceed £10,000 – | 190 |
| | exceeds £10,000 but does not exceed £50,000 – | 560 |
| | exceeds £50,000 but does not exceed £100,000 – | 690 |
| | exceeds £100,000 – | 1250 |
3.4 | The change of use of a building or part, for any purpose other than the creation of a dwelling – | 625 |
| NOTE 1 Where an application relates to a building for mixed use, the fee for any part used as a dwelling shall be calculated in accordance with item 1 and added to the fee payable under item 3. NOTE 2 Where an application relates to the carrying out of more than one item of work in item 3, the fee payable shall be the aggregate of the fees for each of those items of work. | |
4 | CARRYING OUT OF MISCELLANEOUS WORKS (NOT CHARGEABLE UNDER ANY OTHER ITEM) – | |
4.1 | The erection of a retaining wall – | 380 |
4.2 | The provision or material alteration of a drainage system for a dwelling, per dwelling – | 120 |
4.3 | The provision or material alteration of other controlled services and fittings not specified in this Schedule for a dwelling, per dwelling – | 90 |
4.4 | The carrying out of work to underpin a building – | 380 |
4.5 | Work that involves renovation of a thermal element but is not a material alteration | 50”. |
| | | | | | | | |
7 Citation and commencement
This Order may be cited as the Planning and Environment (2011 Fees) (Jersey) Order 201- and shall come into force on the 7th day after it is made.
◊ | Draft 1 – 4th April 2011 | Page - 1 |
|