Skip to main content Skip to accessibility
This website is not compatible with your web browser. You should install a newer browser. If you live in Jersey and need help upgrading call the States of Jersey web team on 440099.
Government of Jerseygov.je

Information and public services for the Island of Jersey

L'înformâtion et les sèrvices publyis pouor I'Île dé Jèrri

Garage conversions (permissions)

​Planning permission

You are able to convert a garage attached to your house without the need for planning permission provided that:

  • it is being built within your domestic curtilage (‘domestic curtilage’ is the area of land on which a dwelling house sits which is used for residential purposes.  It does not include a field or other open land next to a house, even if it is in the same ownership) and
  • the garage is not in front of a principal elevation of the house (‘principal elevation’ means any elevation or wall of a house that faces and is within 20 metres of a public road)
  • the garage height does not exceed 3.5 metres if the roof is pitched (in which case the bottom of the roof planes must not exceed 2.5 metres). This includes a part flat part pitched roof
  • the garage height does not exceed 3 metres if the roof is flat
  • any part of the garage roof if it is within 1 metre of an adjoining property boundary does not exceed 2 metres in height
  • the room will be directly accessible from within the main house
  • it will not be used as a separate unit of accommodation
  • it will not be used for commercial purposes
  • any previous permission relating to the property does not state that the garage must be retained for parking
  • your property is not registered as a listed building or place (LBP) or a potential listed building or place (pLBP) and does not fall within an area of archaeological potential (AAP)
  • no new window or door openings are created or any existing openings blocked up, if the building is in a conservation area (CA)
  • no windows or doors are created or altered above ground level

Note: you will need to apply for planning permission if your 'permitted development' rights have been removed by a condition on a previous Planning Permit in the last 30 years or so.

Is my building or site listed?
Making an application - planning

Building permission

The conversion of a garage, or part of a garage, into habitable space will require building permission

Some of the elements that normally need to be satisfied under the requirements of the building bye-laws when converting a garage include:

  • in-fill garage door
  • flooring 
  • ventilation
  • fire safety

Making an application - building

Back to top
rating button